Dear
Jeroen de Muijnck,
Mickey Nasiri,
Tom Taylor,
Gerald Meyer,
Andrew Draper,
Cordell,
Bryan Hill,
In response to your requests, APC numbers have been allocated to your
contributions as attached.
Best regards,
Sakae OKUBO (Mr.)
***********************************************************
Waseda Research Center
Telecommunications Advancement Organization of Japan (TAO)
5th Floor, Nishi-Waseda Bldg.
1-21-1 Nishi-Waseda, Shinjuku-ku, Tokyo
169-0051 Japan
Tel: +81 3 5286 3830
Fax: +81 3 5287 7287
e-mail: okubo(a)giti.or.jp
***********************************************************
Documents for the Torino meeting (17-20 November 1998)
-----------------------------------------------------------------------
APC- Source Provisional title
-----------------------------------------------------------------------
1426 India Internet traffic on the PSTN
1427 Korea Telecom
Required functions of RTP receiver and packet
forwarding procedure for Dynamic Multicast Network
1428 Accord Video Telecommunication
RTP Maximum Packet size
1429 Intel H.323 version 2 compliant Profile
1430 Editor Draft H.283
1431 PictureTel Changes to draft H.323 related to recommendations
H.282 and H.283
1432 PictureTel H.283 and H.323 Annex E harmonization
1433 PictureTel General comments on Annex E
1434 AT&T Intra-Domain/Inter-Zone Gatekeeper-to-Gatekeeper and
Inter-Domain Border Element-to-Border Element
Communications for Distributive, Centralized, and
Hybrid Architecture
1435 AT&T Viewgraph Presentation of the contribution described
in APC1434
1436 RADVision Master-Slave Determination Procedure in GK routed
call model
1437 Editor Update to Draft Recommendation H.341
1438 ETSI TIPHON Liaison from ETSI TIPHON transmitting the draft Phase
1 and 2 TIPHON architecture (DTS/TIPHON-02002)
1439 ETSI TIPHON Liaison from ETSI TIPHON regarding transport of ISUP
in an H.323 network
1440 Intel New H.245 Messages for Bit-rate Management
1441 (G Kimchi)
1442 (G Kimchi)
1443 (G Kimchi)
1444 (G Kimchi)
1445 Siemens and Videoserver
Conference out of consultation
1446 Siemens Tunnel Transport of SCN Signaling Protocols
1447 Siemens Comments on H.225 Annex G working draft
1448 Intel Coding and usage details for Annex G
1449 Q14 Rapp. New Question of SG15 on PSTN to Internet gateway
1450 MPEG Liaison to Q.12/16
1451 Q12 Rapp. Correction of Amendment 5 to ITU-T Rec. H.222.0|
ISO/IEC 13818-1
1452 Q12 Rapp. Integrated edition of ITU-T Rec. H.222.0|ISO/IEC
13818-1 and ITU-T Rec. H.262|ISO/IEC 13818-2
1453 PictureTel Requirements For Layered Audio Coding
1454 Editor Draft H.450.7
1455 RADVision Comments on GK to GK communication protocol
1456 RADVision Tunneling of H.281/H.224 FECC frames
1457 Toshiba Proposed changes on H.245 codepoints for MPEG-4
visual support
1458 TAO Requirements for the H.32L system
1459 TAO Transmission efficiency, packetization delay and
information rate
1460 NTT DoCoMo Multimedia terminal on IMT-2000 network
1461 Bellcore Media Gateway Control Protocol (MGCP)
1462 COMSAT Support of non-ITU voice codecs in ITU-T
Recommendations
1463 KPN H.450.Call Completion on Busy Subscriber
1464 Ericsson New code point, for T.140, in H.224
1465 Nortel Connection Model For Device Control
1466 Nortel Requirements For The Device Control Interface
1467 Nortel Requirements For SCN-H.323 Signalling Interworking
1468 Siemens Report about ETSI TIPHON meeting of October 26-30,
Tel Aviv
1469 Madge Networks
Scalable security for Annex G
1470 BT Requirements for IVR Control in VoIP
1471 VideoServer ISUP and FAS/NFAS Call Signaling for H.323 Gateways
-----------------------------------------------------------------------