[itu-sg16] AAP64 Last call period closed for H.248.x Recommendations
Hello all,
The last call period on H.248.x Sub-series recommendation has finished. The table below summarizes the result. As can be seen both H.248.1v3 Amd.1 and H.248.9 Amd.1 received last call comments. My impression of the comments is that there is nothing that would be controversial with regards to H.248.9 Amd.1 so I think we could accept the proposed fixes. With regards to H.248.1v3 Amd.1 the IANA H.248 package registration procedure is still outstanding with regards to IETF approval (as indicated by Cisco). Thus I believe it is in our interest to delay approve for a short period of time in order to align the IETF/ITU. Hopefully an Internet Draft will be available soon. As such I have attached drafts of the what I would propose for the AAP Comment Resolution table. Please review and provide comments in case you don't agree or have a modifed resolution.
Regards, Christian
H.248.1 V3 (2005) Amd.1 Gateway control protocol: Version 3: Corrections and clarifications LJ
H.248.8 V4 Gateway control protocol: Error code and service change reason description A
H.248.9 (2005) Amd.1 Gateway Control Protocol: Advanced media server packages: ASR, TTS and Multimedia Enhancements LJ
H.248.12 (2001) Amd.2 Gateway Control Protocol: H.248 packages for H.323 and H.324 interworking: Transport Mechanism A
H.248.29 (2005) Cor.1 Gateway control protocol: International CAS compelled register signalling packages: correction of figures in Annex A A
H.248.49 (H.248.SDPVER) Gateway Control Protocol: Session Description Protocol RFC and Capabilities Packages A
H.248.51 (H.248.TCM)Gateway Control Protocol: Termination Connection Model Package A
H.248.54 (H.248.MPLS)Gateway Control Protocol: MPLS Support Package A
H.248.56 (H.248.VPN)Gateway Control Protocol: Packages for Virtual Private Network Support A
H.248.59 (H.248.ETN)Gateway Control Protocol: Event Timestamp Notification Package A
participants (1)
-
Christian Groves