Yangbo, I have assigned the following numbers: AVD-2885 Requirements for H.248.GMGC Huawei AVD-2886 Proposed Resolution of some issues of H.248.CCC Huawei AVD-2887 Proposed additions to H.248.CCC Huawei AVD-2888 Proposed new Termination Connection Model Package for H.248 Huawei AVD-2889 Proposed new NAT Traversal Toolkit Packages for H.248 Huawei AVD-2890 Proposed Additions to H.248 Sub-Series IG Huawei AVD-2891 Proposal for WI of H.248 TMAN, VLAN, DS and MPLS Packages Huawei AVD-2892 Proposed Amendment to H.248.9 for adding the direction parameter to the aasb package Huawei AVD-2893 Proposed Amendment to H.248.9 for adding the package of multimedia play Huawei AVD-2894 Proposed Amendment to H.248.9 for terminating the recording by command key sequence Huawei AVD-2895 Proposed Amendment to H.248.19 for ASR package Huawei AVD-2896 Proposed Amendment to H.248.19 for floor control package Huawei AVD-2897 Proposed Amendment to H.248.19 for supporting floor control policy Huawei AVD-2898 Proposed Amendment to H.248.19 for supporting floor status change detection Huawei AVD-2899 Draft H.248.CCC - Connection Capability Control Package Editor AVD-2900 Draft H.248.SCR - Statistic Conditional Reporting Package Editor AVD-2901 Draft H.248.2 Amendment 1 Editor AVD-2902 Draft H.248.9 Amendment 1 Editor Thanks! Paul _____ From: Yangbo Lin [mailto:linyangbo@huawei.com] Sent: Tuesday, August 15, 2006 3:26 AM To: Paul E. Jones Cc: OKUBO Sakae; Christian Groves; Noah Luo Subject: Request for AVD numbers Hello Paul, Please allocate the AVD numbers for the following 14 Huawei contributions to Q3/16: 1. Requirements for H.248.GMGC 2. Proposed Resolution of some issues of H.248.CCC 3. Proposed additions to H.248.CCC 4. Proposed new Termination Connection Model Package for H.248 5. Proposed new NAT Traversal Toolkit Packages for H.248 6. Proposed Additions to H.248 Sub-Series IG 7. Proposal for WI of H.248 TMAN, VLAN, DS and MPLS Packages 8. Proposed Amendment to H.248.9 for adding the direction parameter to the aasb package 9. Proposed Amendment to H.248.9 for adding the package of multimedia play 10. Proposed Amendment to H.248.9 for terminating the recording by command key sequence 11. Proposed Amendment to H.248.19 for ASR package 12. Proposed Amendment to H.248.19 for floor control package 13. Proposed Amendment to H.248.19 for supporting floor control policy 14. Proposed Amendment to H.248.19 for supporting floor status change detection And the following 4 Editor drafts of Q3/16: 1. Draft H.248.CCC - Connection Capability Control Package 2. Draft H.248.SCR - Statistic Conditional Reporting Package 3. Draft H.248.2 Amendment 1 4. Draft H.248.9 Amendment 1 Regards, Yangbo
participants (1)
-
Paul E. Jones