Yangbo,

 

I have assigned the following numbers:

 

AVD-2885

Requirements for H.248.GMGC

Huawei

AVD-2886

Proposed Resolution of some issues of H.248.CCC

Huawei

AVD-2887

Proposed additions to H.248.CCC

Huawei

AVD-2888

Proposed new Termination Connection Model Package for H.248

Huawei

AVD-2889

Proposed new NAT Traversal Toolkit Packages for H.248

Huawei

AVD-2890

Proposed Additions to H.248 Sub-Series IG

Huawei

AVD-2891

Proposal for WI of H.248 TMAN, VLAN, DS and MPLS Packages

Huawei

AVD-2892

Proposed Amendment to H.248.9 for adding the direction parameter to the aasb package

Huawei

AVD-2893

Proposed Amendment to H.248.9 for adding the package of multimedia play

Huawei

AVD-2894

Proposed Amendment to H.248.9 for terminating the recording by command key sequence

Huawei

AVD-2895

Proposed Amendment to H.248.19 for ASR package

Huawei

AVD-2896

Proposed Amendment to H.248.19 for floor control package

Huawei

AVD-2897

Proposed Amendment to H.248.19 for supporting floor control policy

Huawei

AVD-2898

Proposed Amendment to H.248.19 for supporting floor status change detection

Huawei

AVD-2899

Draft H.248.CCC - Connection Capability Control Package

Editor

AVD-2900

Draft H.248.SCR - Statistic Conditional Reporting Package

Editor

AVD-2901

Draft H.248.2 Amendment 1

Editor

AVD-2902

Draft H.248.9 Amendment 1

Editor

 

Thanks!

Paul

 

 

 


From: Yangbo Lin [mailto:linyangbo@huawei.com]
Sent: Tuesday, August 15, 2006 3:26 AM
To: Paul E. Jones
Cc: OKUBO Sakae; Christian Groves; Noah Luo
Subject: Request for AVD numbers

 

Hello Paul,

 

Please allocate the AVD numbers for the following 14 Huawei contributions to Q3/16:

 

1.    Requirements for H.248.GMGC

2.    Proposed Resolution of some issues of H.248.CCC

3.    Proposed additions to H.248.CCC

4.    Proposed new Termination Connection Model Package for H.248

5.    Proposed new NAT Traversal Toolkit Packages for H.248

6.    Proposed Additions to H.248 Sub-Series IG

7.    Proposal for WI of H.248 TMAN, VLAN, DS and MPLS Packages

8.    Proposed Amendment to H.248.9 for adding the direction parameter to the aasb package

9.    Proposed Amendment to H.248.9 for adding the package of multimedia play

10.    Proposed Amendment to H.248.9 for terminating the recording by command key sequence

11.    Proposed Amendment to H.248.19 for ASR package

12.    Proposed Amendment to H.248.19 for floor control package

13.    Proposed Amendment to H.248.19 for supporting floor control policy

14.    Proposed Amendment to H.248.19 for supporting floor status change detection

 

And the following 4 Editor drafts of Q3/16:

 

1.    Draft H.248.CCC - Connection Capability Control Package

2.    Draft H.248.SCR - Statistic Conditional Reporting Package

3.    Draft H.248.2 Amendment 1

4.    Draft H.248.9 Amendment 1

 

                                                                                Regards, Yangbo