APC Numbers
Sakae OKUBO
okubo at GITI.WASEDA.AC.JP
Thu Jul 27 01:16:49 EDT 2000
Dear Mr. Potter,
>You may remember there was not time at the Osaka meeting to cover all of
>the contributions uploaded. In particular, we did not have time to
>discuss a BT contribution, APC 1845 - Applying the Extensible Package
>Framework to Annex G'. It was agreed at the time, that this (and other
>docs) would be discusssed at Portland. Does this mean we have to resubmit
>the document again, and get another APC number?
Yes, I remember some contributions were carried over to Portland from Osaka
as attached at the end of this message.
If we should discuss APC-1845 as it is, you need not resubmit it. I will
list it as part of the contributions to be considered at the Portland
meeting. If you wish to make an updated version, it is better to use a new
number with indication of relationship to APC-1845 inside the new document.
Best regards,
Sakae OKUBO
***********************************************************
Waseda Research Center
Telecommunications Advancement Organization of Japan (TAO)
5th Floor, Nishi-Waseda Bldg.
1-21-1 Nishi-Waseda, Shinjuku-ku, Tokyo
169-0051 Japan
Tel: +81 3 5286 3830 (to be transferred)
+81 3 3204 8194 (direct)
Fax: +81 3 5287 7287
e-mail: okubo at giti.or.jp
***********************************************************
Excerpt from APC-1871a
>5.2 Coordination
>
>...
>
>1819 Lucent Technologies Update on ETSI TIPHON architecture work including
>latest TIPHON Architecture Draft
>
>TD-16 has slides that explain this document. TD-35a has updated slides.
>
>
>1820 Lucent Technologies Update on ETSI TIPHON QoS work including latest
>TIPHON End to End QoS Framework Draft
>
>Return to this in the context of the QoS discussion at the Portland
>meeting. TD-17 has slides on this topic.
>
>...
>
>5.5.7 H.225.0 Annex G V2
>
>1797 Editor (M Fortinsky) H.225.0 Annex G version 2 - draft
>1781 Lucent Technologies Reference Points for the Use of Annex G
>1796 Editor (M Fortinsky) H.225.0 Annex G version1 - with corrections
>1845 BT Applying the Extensible Package Framework to Annex G
>
>This material was not covered due to lack of time and will be covered in
>Portland.
-------------
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
For help on this mail list, send "HELP ITU-SG16" in a message to
listserv at mailbag.intel.com
More information about the sg16-avd
mailing list