Dear Experts,
I have posted a preliminary draft of H.323v4 in the Incoming directory of the AVC site. This draft should contain all of the text approved for v4 during the Berlin meeting.
As was mentioned Berlin, we would like to work out issues with the gateway decomposition and application sections as much as possible BEFORE the October meeting. Please, make comments.
Also, there was some text that was accepted in Berlin for the Implementers Guide (relating to v2 and v3) and other text that was intended to be introduced as a rapporteur's TD during the September meeting to correct errors in the H.323v3 white contribution. All of that text should be in this v4 draft document. Please bring my attention to anything that is missing.
I'll have to speak with Mr. Skran to find out exactly what he would like to introduce via a Rapporteur's TD for H.323v3. However, below is a list of things I would personally like to see introduced during the September meeting.
o All changes made to Annex C, which were made to preserve backward compatibility. o Changes made to section 8.1.7 (fast connect procedure) o Changes to 8.4.6 (third party pause)
Please voice your opinion on additions to or deletions from this list.
Best Regards, Paul
Dear Mr. Jones,
PEJ> I have posted a preliminary draft of H.323v4 in the Incoming PEJ> directory of the AVC site.
I have taken a look at the summary portion describing the requirements for compliance of a certain version of H.323. There H.323 V4, H.225.0 V4 and H.245 V6 are indicated with (2001), but our current plan is to have them approved at WTSC (September-October 2000).
Best regards,
Sakae OKUBO (Mr.) *********************************************************** Waseda Research Center Telecommunications Advancement Organization of Japan (TAO) 5th Floor, Nishi-Waseda Bldg. 1-21-1 Nishi-Waseda, Shinjuku-ku, Tokyo 169-0051 Japan Tel: +81 3 5286 3830 Fax: +81 3 5287 7287 e-mail: okubo@giti.or.jp ***********************************************************
Mr. Okubo,
Thank you for pointing out those errors. I will corrections to those dates.
Best Regards, Paul
----- Original Message ----- From: Sakae OKUBO okubo@GITI.OR.JP To: ITU-SG16@mailbag.cps.intel.com Sent: Friday, September 03, 1999 6:10 AM Subject: Re: H.323v4 draft
Dear Mr. Jones,
PEJ> I have posted a preliminary draft of H.323v4 in the Incoming PEJ> directory of the AVC site.
I have taken a look at the summary portion describing the requirements for compliance of a certain version of H.323. There H.323 V4, H.225.0 V4 and H.245 V6 are indicated with (2001), but our current plan is to have them approved at WTSC (September-October 2000).
Best regards,
Sakae OKUBO (Mr.)
Waseda Research Center Telecommunications Advancement Organization of Japan (TAO) 5th Floor, Nishi-Waseda Bldg. 1-21-1 Nishi-Waseda, Shinjuku-ku, Tokyo 169-0051 Japan Tel: +81 3 5286 3830 Fax: +81 3 5287 7287 e-mail: okubo@giti.or.jp
The mailbox of your correspondent has been migrated to a Domino Messaging system and your message has been forwarded to it. This new address is now visible in the Directory. N.B. : if his/her old address is stored in your private Address Book, think to change it.
----------------------------------------------------------------------
La boite aux lettres de votre correspondant a ete migree vers un systeme de messagerie Domino et votre message lui a ete retransmis. Cette nouvelle adresse est visible dans l'annuaire. N.B. : si son ancienne adresse est renseignee dans votre annuaire prive, pensez a la modifier.
participants (3)
-
Chrystele Gueffier
-
Paul E. Jones
-
Sakae OKUBO