Jane,
The only race condition lies in the OLC procedure. It should be possible to restrict OLC procedure elements until FastStart has either completed or is rejected.
bob
------------------------------------------------------------------ Robert Callaghan Siemens Enterprise Networks Tel: +1.561.923.1756 Fax: +1.561.923.1403 Email: Robert.Callaghan@ICN.Siemens.com ------------------------------------------------------------------
-----Original Message----- From: Jane Hua [mailto:huajane@YAHOO.COM] Sent: Wednesday, June 07, 2000 2:18 AM To: ITU-SG16@mailbag.cps.intel.com Subject: Re: On TD26 - Fast TCS and M/S negotiation in H.323v4
Pre Script: Sorry for the previous mail
Hi All,
As far as my understanding goes, the purpose of prohibiting both fastStart and H.245 tunnel in SETUP was to avoid race conditions in two tunnels (fastStart can also be considered as a H.245 tunnel with different procedures). Here we are adding a new tunnel which will lead to more such race scenarios until proper care is taken in defining the procedures.
The decision on this should not be like a voice vote in Congress. The procedures should be clearly documented and circulated over the reflector and let people argue on those concrete documented steps.
Let us see, can we fix the problem introduced by introduction of fastStart?
Regards, Jane Hua
Paul- The problem is that inclusion of an H.245 message in the tunnel terminates FastStart according to section 8.2.1 of H.323. This could be "satisfied" by using the early H.245 element for the replys so that FastStart could proceed. At least this mechanism would make it easy to know that the responder (the called endpoint) was able to overlap FastStart and H.245. -Bob ---------------------------------------------------- Bob Gilman rrg@lucent.com +1 303 538 3868
Paul Long wrote:
Bob,
H.323 only says that fastStart and h245Control cannot both be included in _Setup_, so it could indeed be included in the Setup-UUIE type.
Paul Long Smith Micro Software, Inc.
-----Original Message----- From: Callaghan, Robert [mailto:Robert.Callaghan@ICN.SIEMENS.COM] Sent: Tuesday, June 06, 2000 10:27 AM To: ITU-SG16@MAILBAG.INTEL.COM Subject: Re: On TD26 - Fast TCS and M/S negotiation in H.323v4
Paul,
It would be required in the SETUP, CALL PROCeeding, ALERT, FACILITY, and CONNECT message in that all of these messages can be sent before Fast Start is completed or may not be present with Fast Start elements based on v2.
Bob
For help on this mail list, send "HELP ITU-SG16" in a message to listserv@mailbag.intel.com
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ For help on this mail list, send "HELP ITU-SG16" in a message to listserv@mailbag.intel.com
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ For help on this mail list, send "HELP ITU-SG16" in a message to listserv@mailbag.intel.com
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ For help on this mail list, send "HELP ITU-SG16" in a message to listserv@mailbag.intel.com
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ For help on this mail list, send "HELP ITU-SG16" in a message to listserv@mailbag.intel.com