Pete,
It was specified in section 6.3 of H.450.1 specification
- a FACILITY message shall not be sent if a SETUP message previously sent or received has not been answered.
Srini, Trillium Digital Systems, Inc.
-----Original Message----- From: Pete Cordell [mailto:pete@TECH-KNOW-WARE.COM] Sent: Monday, May 22, 2000 12:12 PM To: ITU-SG16@mailbag.cps.intel.com Subject: Re: On TD26 - Fast TCS and M/S negotiation in H.323v4
Paul, Francois,
I stand corrected...
I thought I read an e-mail a while back that didn't allow you to send facility before a certain stage in the call setup process. After searching I can't find it, and the context might have been different anyway (i.e. Sending SETUP and then SENDING Facility, rather than sending SETUP and then RECEIVING Facility.)
I'm happy now!
Pete
============================================= Pete Cordell pete@tech-know-ware.com =============================================
----- Original Message ----- From: Paul Long Plong@SMITHMICRO.COM To: ITU-SG16@MAILBAG.INTEL.COM Sent: 21 May 2000 01:21 Subject: Re: On TD26 - Fast TCS and M/S negotiation in H.323v4
Pete,
This is already covered in H.323, so there is no need to say it again or
in
another way. Do you think that the text, below, is deficient in some way? Seems pretty clear to me.
8.2.2/H.323v3: "...intermediate entities shall ensure that H.245 messages encapsulated in Q.931 messages are forwarded to the other endpoint even if the Q.931 message in which the H.245 message is encapsulated would be consumed and not forwarded to the other endpoint. This is accomplished by transferring the encapsulated H.245 message into a Facility message with
the
h323-message-body set to empty."
Paul Long Smith Micro Software, Inc.
-----Original Message----- From: Pete Cordell [mailto:pete@TECH-KNOW-WARE.COM] Sent: Saturday, May 20, 2000 12:57 PM To: ITU-SG16@MAILBAG.INTEL.COM Subject: On TD26 - Fast TCS and M/S negotiation in H.323v4
I note that TD-26 has been accepted to show how TCS can be conveyed in parallel with fast start.
However, the example shows the use of call proceeding for receiving TCS back from the remote endpoint. This is not typically an end-to-end message, and therefore how the procedure works with the gatekeeper routed model needs to be addressed.
Possible solutions are:
- Refer to the new text that says it is the responsibility of the
gatekeeper to forward any tunnelled message for which none is available using FACILITY. (There might be some objection from some to using a facility message this early in the call setup process though.)
- Restrict the tunnelling (and probably the fast start info) to
Alerting, Connect and Facility, which generally are end-to-end. I believe this is compatible with the latest procedures for deciding when fast start has been ignored.
Which ever option is chosen, it would also be nice to have a picture for it also!
Pete
============================================= Pete Cordell pete@tech-know-ware.com =============================================
For help on this mail list, send "HELP ITU-SG16" in a message to listserv@mailbag.intel.com
For help on this mail list, send "HELP ITU-SG16" in a message to listserv@mailbag.intel.com
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ For help on this mail list, send "HELP ITU-SG16" in a message to listserv@mailbag.intel.com
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ For help on this mail list, send "HELP ITU-SG16" in a message to listserv@mailbag.intel.com