Dear SG16 experts,
Related to Mr. Li's posting on draft requirements for NAT traversal of H.323 multimedia systems, you have seen the following message from Mr. Campos-Neto, ITU-TSB about the submission of your contributions to the SG16 (SGF or whatever) meeting in November:
At 15:08 +0200 04/09/21, simao.campos@itu.int wrote:
please note that as the next Q.5 meeting will take place in November 04 as part of the main SG 16 meeting, any documents to be reviewed at the meeting must be submitted using the formal submission procedures of contributions (at this point in time, actually "delayed" contributions), in your case I believe through the Chinese administration. Please take a look at TSB Collective Letter 8/16 announcing the SG 16 meeting (see www.itu.int/md/meetingdoc.asp?type=sitems&parent=T01-SG16-COL-0008).
Of course, the version you emailed can be discussed in the email reflector, which is a positive factor towards progressing the work. But as I said, for the proposal to be seen at the SG 16 meeting it would need to be submitted formally through the appropriate channels.
Submission to ITU-TSB through your national channel is a mandatory process for the meeting in November.
Optionally, you are also encouraged to make your documents, even their drafts, available at the avc-site for earlier review and discussion by the experts. For this purpose, I have prepared the following directory:
http://ftp3.itu.int/av-arch/avc-site/2001-2004/0411_Gen/
and taken my liberty to place Mr. Li's draft there as Draft_H.fwreq_040921.zip.